The last train operate was hauled by exactly the same locomotive that ran the first assistance (no.1 in 1896 was the main engine to steam into Queenstown). The rail and other movable goods had been lifted taken off-site, leaving almost all of the bridges intact. Infants will not be confirmed https://danielb839xxx5.wikimeglio.com/user