The primary park features a potential of two hundred MW while Sandrini II has a capacity of 100 MW. The overall cost of both jobs were not disclosed nevertheless, all through development, over 200 personnel were being utilized. The assignments are predicted to see A few positions opening up for https://californiasolarcompany.politics.blog/