Installation Overview At a prominent confectionery site in York, Newsome has installed a efficient 400 kW chiller, marking the noteworthy conclusion of the project. Designed to strengthen ESG targets, the installation improves system dependability while minimising overall energy usage and CO₂ emissions. https://expressbookmark.com/story20713895/energy-efficient-400-kw-chiller-installation-delivers-50-000-yearly-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-reduction