Project Summary Newsome has recently completed the installation and commissioning of a high-performance 400 kW chiller at a leading confectionery manufacturing site in York. This initiative supports a substantial step forward in the client’s ESG framework, enhancing operational resilience and delivering measurable decreases in both energy consumption and carbon footprint. https://bookmarkboom.com/story20696393/energy-efficient-400-kw-chiller-installation-secures-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-reduction